PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Before pouring concrete at underground service pipes Facing South (800x600).jpg Building rebar columns for Elev. 1,2,3  (3rd Floor) Facing East (800x600).jpg Erecting the steel arch at Derrick -2 (2nd Floor) Facing North (800x600).jpg Erecting the steel arch at Derrick -2 (2nd Floor) Facing North-West (800x600).jpg Excavating for underground storm piping between column lines G-G.1 Facing South-East (800x600).jpg Finishing wiring the electrical panel Facing South (800x600).jpg
Previous pageNext page Building rebar columns for Elev. 1,2,3  (3rd Floor) Facing East (800x600)
Building rebar columns for Elev. 1,2,3 (3rd Floor) Facing East (800x600)